— Overview

A short report examining how the Fourth Industrial Revolution, whose importance and responses are a major topic across the media, will be applied in the construction industry. It introduces the Ministry of Land, Infrastructure and Transport's plan to develop technologies responding to the Fourth Industrial Revolution, such as smart construction automation, by 2025, and points out problems in Korea's construction industry, including a bidding system for construction contracts that is driven by price rather than by technological differentiation.

It then explains BIM and 3D-based robotic construction as smart construction automation technologies that enable precise construction on site and can lower the likelihood of accidents, and concludes with tasks for strengthening the competitiveness of the construction industry.

Ad

— Contents and key concepts

The construction industry in an age when robots build buildings

The Fourth Industrial Revolution is changing how construction sites produce, too. This report covers the problems of Korea's construction industry and smart construction automation technology.

Report outline

  • Interest in the Fourth Industrial Revolution
  • The Ministry of Land, Infrastructure and Transport's smart construction plan
  • Problems in Korea's construction industry
  • Limits of the contract bidding system
  • BIM technology
  • 3D methods and construction robots

Smart construction automation technologies

Ad
TechnologyEffect
BIMIntegrated management of design and construction information
3D-based robotic constructionPrecise construction and lower accident risk

Problems of Korea's construction industry and smart construction automation technology

  • It summarizes the Fourth Industrial Revolution with a focus on the construction sector.
  • It is a good reference for assignments on construction management, introduction to architectural engineering and the Fourth Industrial Revolution.
  • It cites press reports on the construction technology policy roadmap as references.
Advertisements

Found this helpful? Share it

Send it to a friend who needs it.

X Facebook Threads
Need the complete file?Total:

Academic reference search

Can't find the reference you need? Try academic search for references now.

Refund policy

Digital files are delivered immediately after payment, so refunds are limited.
◆ Not refundable
- Change of mind / refund requested after partial use / more than 7 days after purchase
◆ Exceptions
- File errors / cannot download or open the file
◆ How to request a refund: send a 1:1 inquiry via Customer Service at the top