The Fourth Industrial Revolution and the Construction Industry: Problems in Korea's Construction Sector and Smart Construction Automation Technology

※ You can preview page 1 as is. Buy it to download the complete original file right away. The file itself is written in Korean.

■ The Fourth Industrial Revolution and the Construction Industry: Problems in Korea's Construction Sector and Smart Construction Automation Technology — Overview

A short report examining how the Fourth Industrial Revolution, whose importance and responses are a major topic across the media, will be applied in the construction industry. It introduces the Ministry of Land, Infrastructure and Transport's plan to develop technologies responding to the Fourth Industrial Revolution, such as smart construction automation, by 2025, and points out problems in Korea's construction industry, including a bidding system for construction contracts that is driven by price rather than by technological differentiation.

It then explains BIM and 3D-based robotic construction as smart construction automation technologies that enable precise construction on site and can lower the likelihood of accidents, and concludes with tasks for strengthening the competitiveness of the construction industry.

Ad

■ The Fourth Industrial Revolution and the Construction Industry: Problems in Korea's Construction Sector and Smart Construction Automation Technology — Excerpt from the original document (in Korean)

스마트 건설자동화 기술은 현장에서의 정밀 시공을 가능케 함과 동시에 사고의 발생가능성을 낮출 수 있어 많은 기대감을 형성하고 있다. 입체 3차원 설계기술인 BIM을 활용한 가상 시공 기술, 3D 프린터를 활용한 건설 부자재의 모듈화, 인공지능을 탑재한 로봇의 조립과 시공 등 그 가능성은 무궁무진하다. 특히 BIM(Building Information Modeling) 기술은 건축물 정보 모델링을 3차원 방식으로 적용하는 것으로 시공이 어렵거나 사고 위험성이 높은 건축물을 가상의 공간에서 설계해 본 뒤에 시공할 수 있는 장점이 있다.

동대문디자인플라자(DDP) 역시 BIM 기술을 이용한 건축물 중 하나이며, 주로 기형적인 건축물의 건축에 주로 활용되는 것을 알 수 있다. 특이한 형태의 건축물은 도시의 랜드마크로 기능할 수 있기 때문에 이러한 목적을 가지고 건축될 수 있으나, 도시의 규모가 커질수록 비정형의 건축물은 늘어날 가능성이 높다.

기존의 설계도면을 활용한 방식은 안정적인 구조 설계에 한계를 가질 수밖에 없는데 이러한 문제점을 BIM 기술이 보완할 수 있다. 뿐만 아니라 설계 과정에서 발생할 수 있는 잘못된 부분을 사전에 수정할 수 있고 시공기간과 비용을 단축할 수 있는 부가적인 효과도 가져온다.

■ The Fourth Industrial Revolution and the Construction Industry: Problems in Korea's Construction Sector and Smart Construction Automation Technology — Contents and key concepts

The construction industry in an age when robots build buildings

The Fourth Industrial Revolution is changing how construction sites produce, too. This report covers the problems of Korea's construction industry and smart construction automation technology.

Report outline

  • Interest in the Fourth Industrial Revolution
  • The Ministry of Land, Infrastructure and Transport's smart construction plan
  • Problems in Korea's construction industry
  • Limits of the contract bidding system
  • BIM technology
  • 3D methods and construction robots

Smart construction automation technologies

TechnologyEffect
BIMIntegrated management of design and construction information
3D-based robotic constructionPrecise construction and lower accident risk

Problems of Korea's construction industry and smart construction automation technology

  • It summarizes the Fourth Industrial Revolution with a focus on the construction sector.
  • It is a good reference for assignments on construction management, introduction to architectural engineering and the Fourth Industrial Revolution.
  • It cites press reports on the construction technology policy roadmap as references.
Ad

■ The Fourth Industrial Revolution and the Construction Industry: Problems in Korea's Construction Sector and Smart Construction Automation Technology References

  1. 사이언즈타임즈(2018.01.12.) 2025년, 건물 짓는 로봇 탄생 미래한국(2018.01.02.) 국토교통부, 4차 산업혁명 대응 '스마트 건설자동화' <건설기술정책 로드맵> 수립
Need the complete file?Total: · instant download after payment
Psych UP

Take a break with a quick personality test?

Ranked by actual participation. Results in about a minute.

More

Loading…

Popular

Most-read content

Loading view counts…

Campusdown is a lifelong-learning community in Korea offering study materials, information on government support, student loans and scholarships, and more. Don't miss our free resources.

Go to the Campusdown home page →
Ad

Refund policy

Digital files are delivered immediately after payment, so refunds are limited.
◆ Not refundable
- Change of mind / refund requested after partial use / more than 7 days after purchase
◆ Exceptions
- File errors / cannot download or open the file
◆ How to request a refund: send a 1:1 inquiry via Customer Service at the top